A flat site

The demolition team have finished, the site looks huge but flatter than we had thought and we have been discussing different options for the foundations. We are hoping to start building the edges of the terrace with the gabions (wire … Continue reading

Posted in Enabling & Groundworks | 2 Comments

what house?

This week has seen the final walls come down… a massive bonfire… metal recycling… and building a platform from which to work in the future

Posted in Enabling & Groundworks | Leave a comment

…and the house came tumbling down!

Posted in Enabling & Groundworks | 3 Comments

Demolition!

Asbestos out, services cut off last week. Monday 10th we started with the carpets and copper, Tuesday the rads and today the tiles are being picked off the roof and deftly thrown down by a chain of men in lots … Continue reading

Posted in Enabling & Groundworks | Leave a comment

Wynford drawings

Here are some drawings. Wynford 1st Floorplan 30 oct 10Wynford elevation 1 of 2 30 oct 10Wynford elevation 2 of 2 30 oct 10Wynford Lr Grd Floorplan 30 oct 10Wynford roof plan 30 oct 10Wynford site plan 30 oct 10Wynford … Continue reading

Posted in Architecture & design | Leave a comment